• Estimation of investment model cost parameters for VSC HVDC transmission infrastructure 

      Vrana, Til Kristian; Härtel, Philipp (Journal article; Peer reviewed, 2018)
      Investment model cost parameters for VSC HVDC transmission infrastructure continue to be associated with high uncertainty and their validity remains a crucial challenge. Thus, it is the key objective of this analysis to ...
    • Improved investment cost model and overhead cost consideration for high voltage direct current infrastructure 

      Vrana, Til Kristian; Härtel, Philipp (Chapter; Peer reviewed, 2023)
      The ongoing large-scale deployment of offshore wind parks creates the need for substantial investments in Voltage Source Converter (VSC) based High Voltage Direct Current (HVDC) transmission infrastructure. An investment ...
    • Improving wind power market value with various aspects of diversification 

      Vrana, Til Kristian; Svendsen, Harald Georg; Korpås, Magnus; Couto, António; Estanqueiro, Ana; Flynn, Damian; Holttinen, Hannele; Härtel, Philipp; Koivisto, Matti; Lantz, Eric; Frew, Bethany (Chapter; Peer reviewed, 2023)
      The wind generation share in many European bidding zones is now large enough to affect the market value of wind power, and wind energy is getting less-than-average market price in day-ahead markets. As alternatives to ...
    • Influence of hydrogen import prices on hydropower systems in climate-neutral Europe 

      Schmitz, Richard; Naversen, Christian Øyn; Härtel, Philipp (Peer reviewed; Journal article, 2023)
      While climate and energy policy targets require fundamental changes and expansions in the energy infrastructure, hydropower systems across Europe remain essential for low-carbon energy systems. With renewable fuel import ...
    • Review of investment model cost parameters for VSC HVDC transmission infrastructure 

      Härtel, Philipp; Vrana, Til Kristian; Hennig, Tobias; Bonin, Michael; Wiggelinkhuizen, Edwin Jan; Nieuwenhout, Frans (Journal article; Peer reviewed, 2017)
      Cost parameters for VSC HVDC transmission infrastructure have been gathered from an extensive collection of techno-economic sources. These cost parameter sets have been converted to a common format, based on a linear ...